September 1st, 2015

St Leonards-on-Sea Hospital

St-LeonardsA hospital in St Leonards-on-Sea required the installation of a dedicated cold water booster service for Endoscopy Sterilisation Equipment.

Aquatech Pressmain supplied our AMV2-2-9 cold water booster set complete with 100 litre flow through vessel, APT570 mains water break tank.

The installation was undertaken by Acorn Pressurisation Services and involved providing a copper mains water pipe to the new break tank and stainless steel suction and discharge pipe work from the pump set.

As part of the hospital’s infection control procedures all of the pipe work was disinfected in accordance with the HSE’s Approved Code of Practice and Guidance Document L8, Legionnaires’ disease.