Heating Basildon & Thurrock University Hospital
8th July 2019
AGM Plc’s projects installation team supplied and installed a new sealed system pressurisation unit for the heating system at Basildon & Thurrock University Hospital.
Controlling the expansion and contraction of the 70,000 litres heating system, the new Aquatech Pressmain Spillpress pressurisation Unit keeps the hospital heating system operating at a temperature of 90 degrees centigrade and pressure of 8.0 bar.
Darren Harris from Basildon & Thurrock University Hospital commented.
"Please pass on my gratitude to your installation team for a thoroughly professional and tidy job; I am very pleased with the outcome”.