June 18th, 2018

Aquatech Pressmain products help maintain water services for global bank

For their Head Office in London the bank required continuous low temperature hot water for the heating system, along with a continuous chilled water supply to the air conditioning in the server rooms.

To guarantee this level of continuous service, and considering the limitations of the space available in the plant room, Aquatech Pressmain provided the solution using two of their AP7 pressurisation units, one running, one in duty standby mode for the hot water and another two set up in the same way for the chilled water system. All four units are in use ensuring equal wear, controlled by a changeover panel.

The four units are housed in a bespoke framework designed and manufactured to fit in the restricted space within the plant room, at the same time ensuring easy access for maintenance.

Aquatech Pressmain’s project division installed the units and they will be maintained by them under their maintenance contact with 24/7 call out.

If you have a project which needs this level of service please contact Aquatech Pressmain on 01206 215121